Trails End Water Line Project


JWSC crew calculating the trench angle (trencher provided by Vermeer Equipment Sales of Texas) Laying the Water Line

Trench preparation for 8" water transmission line. Laying the Water Line

JWSC crew installing 6" water line and preparing for a fire hydrant installation. Laying the Water Line

12" high density polyethylene (hdpe) water line (floating on the surface) in route to the Jonestown side of the lake from Trails End Subdivision Lake Crossing

Preparing to sink the 12" high density polyethylene (hdpe) water line (barge work provided by Chapman Marine) Lake Crossing




Aerial shot of intersection of Womack and East Darleen in the Trails End Subdivision (picture taken by Konrad Spitzenberger in his Ultralite) Trails End Subdivision